Basic Info.
Model NO.
steel building 72
Usage
Warehouse, Temporary Offices, Workshop
Column and Beam
Welded H-Section and Hot Rolled I-Section
Purlin
C-Section and Z-Section
Roof and Wall Panel
EPS, PU ,Rock Wool Sandwich Panel
Window
PVC or Aluminum Alloy
Door
Sliding or Rolling Door
Packaging Details
in Bulk or as Customers Request
Delivery Detail
15-30 Days After Receiving Deposit
Product Description
Light Steel Frame for Workshop, Warehouse Building
TECHNICAL DETAILS:
1. Wind Load, Snow Load, Earthquake and Rainfall
2. Length, Width, Eave Height and Roof Slope
3. Single Floor or Multi-floor
4. Clear Span or Multi-span
5. Requirements on the brick wall
6. Requirements on the roof and wall materials
7. Requirements on the type & quantity of window and door
8. Requirements on the natural lighting & ventilation system
MAIN STEEL PART
1. H section steel columns, beams and wind-proof columns
2. With treatment of one time red-oxide primer painting and two times grey facing painting
SECONDARY STEEL PART
1. Roof & Wall C/Z Purlin
2. Tie Bar: φ 89*3.0
3. Roof Support & Support between Columns: φ 20
4. Bracing Bar: φ 12
5. Knee Bracing: Angle Steel
ROOF & WALL CLADDING
1. Roof & Wall Corrugated Single Steel Sheet: 0.3mm-0.6mm
2. Roof & Wall Sandwich Panel Insulated with EPS Foam, Glass wool, Rock wool and PU: 50mm-150mm
3. Transparent Sheet (FRP): 1.0mm-2.0mm
4. Flashings: Made by Color-coated Corrugated Steel Sheet
WINDOW & DOOR
1. Window: PVC Window or Aluminum-alloy Window
2. Door: Sliding Door or Roll-up Door
FASTENERS
High-strength Bolt; Common Bolt and Nut; Self-tapping Screws; Foundation Bolt and Nut, ETC
DELIVERY
1. Lead Time: 30-45 days
2. Loaded in 20GP, 40GP; 40HC; 40OT; 45 HC
3. Package: Standard Package
OTHER OPTIONAL ACCESSORIES
1. Gutter
2. Downpipe
3. Brick Wall: The height of brick wall is depended on client's need
4. Ventilation System
5. Lifting Height of Crane: >6m
6. Lifting Weight of Crane: 3-30T
PAYMENT TERMS
1.30% T/T before production; The balance before shipment
(1) Simple Steel Structure Workshop |
Main structure | Single span: L -shorter than 18m, H -lower than 6m |
Maintenance system | Roof | Colored steel sheet with 50mm glass wool insulation |
Wall | Colored steel sheet |
Door | Simple steel rolling shutter (within 10m2) |
Window | Very few |
Usage | Warehouse, workshop |
Standard and suitable market | Africa, Middle-East, South America (no snow, wind load below 0.4kn/m2) |
|
(2) Standard Steel Structure Workshop |
Main structure | Single span: L -shorter than 24m, H -lower than 8m |
Maintenance system | Roof | Colored steel sheet with 50mm glass wool insulation |
Wall | Colored steel sheet or 50mm EPS sandwich board |
Door | Wind resistance rolling door(within 15m2) |
Window | Alu. Alloy (can use with skylight) |
Usage | Warehouse, workshop, shopping mall, exhibition hall, super market |
Standard and suitable market | Snow loading below 0.5kn,wind loading below 0.5kn/m2 |
|
Address:
No. 3027, Room No. 64, Dongjing Road Free Zone Qingdao City, Qingdao, Shandong, China
Business Type:
Manufacturer/Factory, Trading Company
Business Range:
Industrial Equipment & Components, Manufacturing & Processing Machinery
Management System Certification:
ISO 9000
Company Introduction:
Our company supplies different kinds of products. High quality and favaroble price. We' Re pleased to get your Inquiry and we will come back to as soon as possible. We stick to the principle of "quality first, service first, continuous improvement and innovation to meet the customers" for the management and "zero defect, zero complaints" as the quality objective.